Identifying CEE / Ufer

petersonra

Senior Member
Location
Northern illinois
Occupation
engineer
I know that we tend to come up with a lot of what ifs, like is it 10' long? Is it actually ground rod? At the end of the day you've installed two new ground rods which qualify as the GES so getting rid of the old "whatever it is" is not a problem.
if there is a qualifying ground rod there don't you still have to use it even if you added ten more ground rods.
 
Top