A friend of mine owns a machine shop. They are moving to a smaller space that only has 400a 3Phase (existing is 800a). They are getting rid of some equipment but are still concerned that they will not have power to meet code calculations. I was thinking that they could put two pieces of equipment that are never needed at the same time onto contactors controlled by a 3-way switch so that only one piece of equipment could have power at one time. Does anyone know if this is satisfactory for load calculation purposes? We mostly do resi.