We have 400 amp service to office building with back up auto gen.Meter from utility goes first goes to the transfer switch witch is also first point of disconnect.Its 2 main breakers (400 each mechanical abilities to limit to one breaker at time) this is my service.Has both manuel and automatic transfer.Neutral and ground are bonded at this point.Inspector does not like gen. connection .2 X 500 + 350 and ground.Ground and neutral seperate at gen.,gen has a main breaker disconnect built in.At transfer switch we landed neutral to neutral terminal block and ground to the ground block.So far sounds fine ?He wants us to remove the jumper from ground to neutral at transfer switch.I say no can d
pinions ?