Thanks guys! I can't take credit for the lock out though :) I'm guessing my maintenance buddy did it as I was told nobody on staff ever goes into the electrical room. The equipment should arrive this coming week, not sure if I'll be summoned to hook it up or not, but if so, I'll take a couple pics of it.
 
🤔
Please elaborate.
That is an incorrect term often used to refer to the bonding required by 250.64(E).
It is my opinion that no additional bonding is required where the GEC enters the transformer enclosure.
We can't see the rest of the GEC, so no idea if that type of bonding would be required for some other part of the GEC route.
 