They other day we were bringing online a small data center. During start up and assurance testing the main tripped do to the fact the instantaneous setting on the breaker had not been set properly. We dialed it up to 10 and everything held as planned. Now my question is: What is the calculation needed to figure out how high to set the INST? The data center will be adding 480/120-208 PDU's down the road and I don't want the main to trip when I turn them on.
Any thoughts?