This thread got me thinking and looking.
Suppose I have a 1/2" run of Schedule 40 containing a 20A circuit.
Could I run a an insulated hot, neutral, and leave the EGC uninsulated?
Suppose I have a 1/2" run of Schedule 40 containing a 20A circuit.
Could I run a an insulated hot, neutral, and leave the EGC uninsulated?