zinsco
Member
- Location
- San Diego, CA
Installing a 100 amp 3ph 120/208v panel. Running emt from a 6 meter section at the switchgear to suit 100a.  My panel does have concentrics, but since it is not over 250v am I correct in believing that it will not require a bonding bushing?
	
		
			
		
		
	
				
			 
				
 
 
		