I have a Delta to Delta step down transformer, HV 480, LV 240, 3 phase general purpose transformer, I am required to install, an GEC, when there is no natural??
from what I read, an GEC is required.
Grounding electrode conductors at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system shall be installed as specified in 250.64(A) through (F).
Thank you, for all the information and you time.