Doing a bathroom renovation. There was a duplex receptacle under the old tub; I don't think the box was nailed to anything. We're installing a free-standing tub, so my carpenter just landed the receptacle in the corner of that half-wall.
Is it against code to have all that extra wire pushed up into the cavity between the studs? If so, what is the (potential) hazard, exactly?
Pics: https://imgur.com/a/w231ynx
Is it against code to have all that extra wire pushed up into the cavity between the studs? If so, what is the (potential) hazard, exactly?
Pics: https://imgur.com/a/w231ynx