Scenario- 600 amp rated CT can, meter can, and SQ. D I-Line Panelboard used to build a 600 amp service. Panelboard has 4 3-pole 100 amp breakers installed and 6 empty spaces (presumably for 2 futre 3-pole 100 amp breakers). Inspector failed job and quoted 6-handle rule stating that "Someone could easily install 6 1-pole breakers in those spaces". I say he should only inspect what is installed at the time of inspection and should not red-tag on "what-ifs" unless he has a code section that begins with "what-if". What say ye O wise forum friends? I belive this to be the same as saying " The GFI receptacles "might" get changed out to standard receptacles after I sign off this permit so I'm going to fail the job."
BTW, the panelboard has no main breaker installed, Inspector insisted that we install one before he would pass inspection. We did it, mostly because time was important and we didn't have any extra time to argue about this issue. Just burns me a little that we had to spend the cash to buy a 600 amp main.
BTW, the panelboard has no main breaker installed, Inspector insisted that we install one before he would pass inspection. We did it, mostly because time was important and we didn't have any extra time to argue about this issue. Just burns me a little that we had to spend the cash to buy a 600 amp main.
Last edited: