Is PVC schedule 80 on the concrete floor along an exterior wall-OK?

Status
Not open for further replies.

LeNerd

New User
Location
New Jersey
Hi all first poster here. I am putting a ground mounted solar system in. The inverter is going on the inside wall of my boiler room. The room is finished but its built against the house on its own foundation and shares a wall with the house to avoid how the local inspector may classify it, we decided to run THHN in schedule 80 pvc conduit above the sheetrock. It comes in on the floor against an exterior wall for 4ft and then about 5 ft up the wall to the inverter's DC disconnect, Is the conduit staying on the floor after it entered the building OK?
 
I am closing this thread, in accordance with the Forum Rules.

This site is designed for:


  • Contractors
  • Electricians
  • Engineers
  • Inspectors
  • Instructors
  • Other electrically related individuals

* This NEC Forum is for those in the electrical and related industries. Questions of a "How-To" nature by persons not involved in the electrical industry will be removed without notice.
If you feel this action to be in error, feel free to contact me via PM to explain.
 
Status
Not open for further replies.
Top