Krim
Senior Member
- Location
- Maryland's Eastern Shore
Ok since the consensus is against LB's for corner use with the larger wire,
just what do you suggest as the best way to accomplish this.The job I've mentioned in another posting has alot of corners.So far I'm still contemplating the various angles to order but it also looks as though the best way is going to be pushing the wire through the conduit and whatever fittings and than cement the fittings together as I go.Someone had mentioned that you can't fit 3 -#350s in a standard 3" LB. If the conduit is sized large enough per the conduit fill tables, you're saying that the condulets aren't designed to allow the wire to fit ?
just what do you suggest as the best way to accomplish this.The job I've mentioned in another posting has alot of corners.So far I'm still contemplating the various angles to order but it also looks as though the best way is going to be pushing the wire through the conduit and whatever fittings and than cement the fittings together as I go.Someone had mentioned that you can't fit 3 -#350s in a standard 3" LB. If the conduit is sized large enough per the conduit fill tables, you're saying that the condulets aren't designed to allow the wire to fit ?