Anybody care to shoot me their job cost for this project. Run 40' 3/4 emt from panel to ceiling j-box(2 LB's 3 90's 4 beam clamps and minis 2 strut straps, work height 13') Pull 3 #6 THHN cond's 46' each to a 4 11/16 deep box, splice, and transition to a 16' drop of 6-3 bus drop cable and terminate in XFMR. Hubbel strain reliefs used on both ends of drop. CB's used, 1 QO350 plug in, and 1 QO2020 plug in(the later being used to make room for the 3pole. Almost forgot, drive 1 8' Cu clad ground rod thru 6" concrete per machine set up specs and tie into ground bus in cabinet
 

Buck Parrish

Senior Member
Location
NC & IN
Anybody care to shoot me their job cost for this project. Run 40' 3/4 emt from panel to ceiling j-box(2 LB's 3 90's 4 beam clamps and minis 2 strut straps, work height 13') Pull 3 #6 THHN cond's 46' each to a 4 11/16 deep box, splice, and transition to a 16' drop of 6-3 bus drop cable and terminate in XFMR. Hubbel strain reliefs used on both ends of drop. CB's used, 1 QO350 plug in, and 1 QO2020 plug in(the later being used to make room for the 3pole. Almost forgot, drive 1 8' Cu clad ground rod thru 6" concrete per machine set up specs and tie into ground bus in cabinet


I would say about $2500. - $3000.
 
Status
Not open for further replies.
Top