job cost 240V3phase 50A machine hookup

Status
Not open for further replies.

nizak

Senior Member
Anybody care to shoot me their job cost for this project. Run 40' 3/4 emt from panel to ceiling j-box(2 LB's 3 90's 4 beam clamps and minis 2 strut straps, work height 13') Pull 3 #6 THHN cond's 46' each to a 4 11/16 deep box, splice, and transition to a 16' drop of 6-3 bus drop cable and terminate in XFMR. Hubbel strain reliefs used on both ends of drop. CB's used, 1 QO350 plug in, and 1 QO2020 plug in(the later being used to make room for the 3pole. Almost forgot, drive 1 8' Cu clad ground rod thru 6" concrete per machine set up specs and tie into ground bus in cabinet
 
Anybody care to shoot me their job cost for this project. Run 40' 3/4 emt from panel to ceiling j-box(2 LB's 3 90's 4 beam clamps and minis 2 strut straps, work height 13') Pull 3 #6 THHN cond's 46' each to a 4 11/16 deep box, splice, and transition to a 16' drop of 6-3 bus drop cable and terminate in XFMR. Hubbel strain reliefs used on both ends of drop. CB's used, 1 QO350 plug in, and 1 QO2020 plug in(the later being used to make room for the 3pole. Almost forgot, drive 1 8' Cu clad ground rod thru 6" concrete per machine set up specs and tie into ground bus in cabinet


I would say about $2500. - $3000.
 
Status
Not open for further replies.
Top