Just can't understand why EBM, Estimation, Accu-Bid, etc. use one standard labor unit for installing #12 THHN ( for Example)(4.0/M).
It doesn't matter if your pulling 3 #12's or 6 #12, the labor rate per foot remains the same.
I realize that these rates probably reflect only 50% of the actual pull, the other %'ages in Layout, material handling, Etc.
Even given that, I know it the labor unit per foot should decline for each additional #12 pulled in to the raceway, just like parallel raceways are labor discounted.
I'm getting close to taking the extrodinary time to create my own assemblies that reflect a lower Labor rate for additional conductors pulled in a raceway. It will be a very time consuming task.
That's why I'm consulting this forum for alternates prior to taking the 2-3 weeks to edit my data base.
Thanx in advance
Unbridled:thumbsup:
It doesn't matter if your pulling 3 #12's or 6 #12, the labor rate per foot remains the same.
I realize that these rates probably reflect only 50% of the actual pull, the other %'ages in Layout, material handling, Etc.
Even given that, I know it the labor unit per foot should decline for each additional #12 pulled in to the raceway, just like parallel raceways are labor discounted.
I'm getting close to taking the extrodinary time to create my own assemblies that reflect a lower Labor rate for additional conductors pulled in a raceway. It will be a very time consuming task.
That's why I'm consulting this forum for alternates prior to taking the 2-3 weeks to edit my data base.
Thanx in advance