will try to keep this short.......Went to a give an estimate to a potential customer....a house(residential) in the same neighborhood was under construction.....electrical contractor on job site....he had to redue a lot of his wiring due to theft of copper.....all of the panel wiring had been cut about 6 inches inside panel.....that was two (200 amp) panels...the inspector had given him permission to install a junction box in the attic and splice all conductors from j-box to panels......have any of you come across this and what thoughts about troubleshooting....