Hypothetical scenario here.. say one is designing a large multi-family residential building, and the building wanted to have all units at 240/120 1ph 3w, and the utility is provided at, say, 12kV 3ph.
What is the 'typical' way to do this?
I'm imagining that this would be done by having, potentially, three transformers... primary side essentially connected like a delta configuration.... on the secondary, is it sensible to have a mid-tap on each of the three transformers?
Something like this:
What is the 'typical' way to do this?
I'm imagining that this would be done by having, potentially, three transformers... primary side essentially connected like a delta configuration.... on the secondary, is it sensible to have a mid-tap on each of the three transformers?
Something like this: