CopperTone
Senior Member
- Location
- MetroWest, MA
I really need to understand something here. Look at these bid results. Prevailing wage job in eastern mass. Again - 9 EC's bidding - wow - such a small job too.
9100.00
13684.00
16791.00
17800.00
19250.00
21773.00 *** my bid
22600.00
25900.00
38794.00
another bid result from today- separate part of similar job - same town - same bidders - same finish order per EC.
16000.00
23499.00
29643.00
32725.00
35750.00
39617.00 ** my bid
41600.00
46000.00
77138.00
now, 3rd,4th,5th, & 8th place bids were disqualified for incomplete bids on both jobs (they must've left out something of the bid packet)
that leaves
9100.00
13684.00
21773.00 *** my bid
22600.00
38794.00
16000.00
23499.00
39617.00 ** my bid
41600.00
77138.00
I'm not even saying my price is right and others are wrong or low balling - although the lowest bidder is below low balling - he seems flat out illegal.
We're a small company and my price was going to make us a small profit - nothing big at all - and if we ran into any snags - we'd be even on the job.
So - how do these guys do it? 0% mark up on material? taking a loss on the job? any ideas? not paying prevailing wage and lying about it?
9100.00
13684.00
16791.00
17800.00
19250.00
21773.00 *** my bid
22600.00
25900.00
38794.00
another bid result from today- separate part of similar job - same town - same bidders - same finish order per EC.
16000.00
23499.00
29643.00
32725.00
35750.00
39617.00 ** my bid
41600.00
46000.00
77138.00
now, 3rd,4th,5th, & 8th place bids were disqualified for incomplete bids on both jobs (they must've left out something of the bid packet)
that leaves
9100.00
13684.00
21773.00 *** my bid
22600.00
38794.00
16000.00
23499.00
39617.00 ** my bid
41600.00
77138.00
I'm not even saying my price is right and others are wrong or low balling - although the lowest bidder is below low balling - he seems flat out illegal.
We're a small company and my price was going to make us a small profit - nothing big at all - and if we ran into any snags - we'd be even on the job.
So - how do these guys do it? 0% mark up on material? taking a loss on the job? any ideas? not paying prevailing wage and lying about it?