A customer has provided us with a 4 inch LED downlight for new construction. It comes with a driver module. There is no can, JB, nothing.
It's like this - http://www.amazon.com/dp/B00MN0WEUY?psc=1
I know it is not UL listed but in our location this would not be an issue.
Ceiling will not be insulated. The drop from slab to ceiling is about 12 inches.
The issues I need to solve are
If I install a 4 inch box as a JB, can I put the driver in it or would that risk overheating?
Can the driver be replaced without tearing down the ceiling?
Is there a suitable housing that we can use to make this installation code compliant and safe?
Does the JB need to be accessible without tearing down the ceiling? How does anyone get to the JB through such as small opening?
In new work fixtures, how are they maintained if there is a problem?
It's like this - http://www.amazon.com/dp/B00MN0WEUY?psc=1
I know it is not UL listed but in our location this would not be an issue.
Ceiling will not be insulated. The drop from slab to ceiling is about 12 inches.
The issues I need to solve are
If I install a 4 inch box as a JB, can I put the driver in it or would that risk overheating?
Can the driver be replaced without tearing down the ceiling?
Is there a suitable housing that we can use to make this installation code compliant and safe?
Does the JB need to be accessible without tearing down the ceiling? How does anyone get to the JB through such as small opening?
In new work fixtures, how are they maintained if there is a problem?