Re: Listed GEC /Rod Clamp?
A point to consider here is that any approved listing is nullified and doesn't mean a thing if it is installed incorrectly.
For example: You may want to rate your conductor ampacity for 90 degree Celsius. When the system fails because 75 degree Celsius terminals were used... Then, terminals that are 90 degree Celsius rated but torqued incorrectly are useless; the testing laboratory isn't accountable, the manufacturer is not in any way accountable. Too many ugly things goin' on in my trade fellas.
grandpapastu.