Background details:
- Designing MW-scale PV site
- Major manufacturer (mfr) has UL listed skid that is comprised of several components
- The same major mfr can swap out one of the components within the skid to meet our specific requirements. The skid would no longer be listed then.
- The new part that they're putting into it is listed
Anybody know how this would all work from code and listing requirements and what I need to watch out for?
It seems like this is then just the same as if it were site-built, so I'm wondering what the biggest risks and concerns would be.
- Designing MW-scale PV site
- Major manufacturer (mfr) has UL listed skid that is comprised of several components
- The same major mfr can swap out one of the components within the skid to meet our specific requirements. The skid would no longer be listed then.
- The new part that they're putting into it is listed
Anybody know how this would all work from code and listing requirements and what I need to watch out for?
It seems like this is then just the same as if it were site-built, so I'm wondering what the biggest risks and concerns would be.