Nec says when calculating for gen lighting to measure using outside dimentions.
What if you have a single story 1000sq ft house and 1/2 of the basement is later finished. The service then needs to be recalculated with an aditional 1000sq ft added as oposed to just the 500sq ft. thats actually finished, Right?