(...continued from a previous post.) I am trying to determine how to figure the full load amps of an existing commercial kitchen panel. I have read each leg of each phase during peak hours and added in some new load/amps for some kitchen equipment. I need to submit this information for a permit. The A phase reads 78.84 amps, the B phase reads 61.19 amps and the C phase reads 50.14 all included with the new equipment turned on. How do you determine what the Total load amps for this panel would be? Thanks.