Hi,
Many AHJ's allow a load side connection for solar on a disconnect panel that only has one breaker inside (for example) and that breakers feeds the house sub panel.
We can connect using UL approved connectors on the load side of that breaker inside the MSP. (with fused disconnect)
Some plan checkers need more convincing that this is allowable.
Can anyone point me to the code that talks about requirements and what is allowed with a load side connection?
Thanks in advance!
Many AHJ's allow a load side connection for solar on a disconnect panel that only has one breaker inside (for example) and that breakers feeds the house sub panel.
We can connect using UL approved connectors on the load side of that breaker inside the MSP. (with fused disconnect)
Some plan checkers need more convincing that this is allowable.
Can anyone point me to the code that talks about requirements and what is allowed with a load side connection?
Thanks in advance!