First post here. Got a unique setup here and want to help clarify a disagreement I and a co-worker have on our interpretation of the rules.
We are looking to do a line-side tap connection on our solar connections. The current electrical setup is ( Utility Meter > 200A Fused Service Disconnect > ~200ft of Trenching > 200A Loadcenter with 200A main breaker)
My understanding is that the tap would need to happen prior to the 200A fused service disco and anything past would be load-side. I worry about potentially tripping the 200A main breaker downstream frequently. Could y'all help clarify and settle this for me? Code citations would be awesome so I can match the book to our site. Thanks!
Scribled picture attached.
We are looking to do a line-side tap connection on our solar connections. The current electrical setup is ( Utility Meter > 200A Fused Service Disconnect > ~200ft of Trenching > 200A Loadcenter with 200A main breaker)
My understanding is that the tap would need to happen prior to the 200A fused service disco and anything past would be load-side. I worry about potentially tripping the 200A main breaker downstream frequently. Could y'all help clarify and settle this for me? Code citations would be awesome so I can match the book to our site. Thanks!
Scribled picture attached.