Hi,
I'm working on a project, a building with 2 units, one commercial on first floor and one residential on second floor. The meter section is located in the basement. Local code requires a main service disconnect to be located outside building on exterior wall of first floor. It's a 400A, 3-Phase service. Where does the CT cabinet go? by the meter section in the basement, or by the 400A disconnect on exterior wall on first floor? Aren't CT's supposed to be by the utility meters?
Thank You
I'm working on a project, a building with 2 units, one commercial on first floor and one residential on second floor. The meter section is located in the basement. Local code requires a main service disconnect to be located outside building on exterior wall of first floor. It's a 400A, 3-Phase service. Where does the CT cabinet go? by the meter section in the basement, or by the 400A disconnect on exterior wall on first floor? Aren't CT's supposed to be by the utility meters?