Logical grid-tie solar wiring

Status
Not open for further replies.

mostlybirch

New User
Location
Interior Alaska
Occupation
geo scientist
Hello,
I am planning the grid-side of a grid-tied solar system to write-up the one line diagram for the utility. I currently have a 200a service entrance with two 100a breakers feeding a house panel and garage panel. Ideally, I would run the solar through the safety shutoff and into the main distribution panel. However both circuits are full. I believe this leaves me with the option of running the AC from the indoor inverter outdoors to the safety switch and back indoors to the garage panel OR build another sub outdoors. What would be the most logical, or tidiest option here, ideally with the option to add a generator interlock?

Thanks

AP1GczMlRmCShFQO2yXAAlUi3cIYkgvB_nG1WCQj1ffwnEJ8E3YVor3k4yBud8kyO8iiwfawnDXZCVSp0SqCl_QlFjbQPZrVlDd0NEG8T-BkuF1QiXrSoUh7rIhifr_gESAXqkCBeveUzatRTFGGPSMMV-xBkQ=w660-h879-s-no
AP1GczNEcvt6aRbD_FJgGkp74EfIhhyOWsB_-kjEl_bjg1qoWPGPl-hEeU29aUyiEPyqfiR163esHx5sy3lMZls5QavHHLw2mGBpgn3hbP2v88SiaQcg7vW7pv9jDJ98WxxLl1bi6WPdbJGKC7LkS_ATSeq1-A=w780-h552-s-no
 
I am closing this thread in accordance with forum rules. We are not allowed to assist a person who is not an electrician to perform their own electrical installation work.
 