- Location
- Bremerton, Washington
- Occupation
- Master Electrician
I'm helping an electrician with a long wire pull at a Golf Course, where we can't leave the ditch open. Its 1000 ft of 4/0-4/0-4/0-2/0 Al XHHW XLP-2 condcutor. The plan is for one large pull box in the middle, with 3" PVC conduits, 2 90 degree sweeps, the conduit will have some deflection.
Is the gut feeling this is "pullable" (with a tugger) or should a second pull box be added?
Is the gut feeling this is "pullable" (with a tugger) or should a second pull box be added?