Sure some( as they've said before) will say this is a dumb question but since never being the field I think it's a reasonable question.
So have 8 sets #750 AL going about 100' horizontal then rising up about 225' vert, then about 100' horz again. So about 425' total. It's switchgear feeding switchgear.
1. Should definitely splice these conductors at some point as I believe that would make the pull easier, correct?
2. What would the pulling scheme/setup be as far as equipment and where would it be placed? Reel jacks, tugger and pulleys I believe???
3. In riser runs like this what determines when to splice?
I sketched up a rough riser.
Thank you very much.
So have 8 sets #750 AL going about 100' horizontal then rising up about 225' vert, then about 100' horz again. So about 425' total. It's switchgear feeding switchgear.
1. Should definitely splice these conductors at some point as I believe that would make the pull easier, correct?
2. What would the pulling scheme/setup be as far as equipment and where would it be placed? Reel jacks, tugger and pulleys I believe???
3. In riser runs like this what determines when to splice?
I sketched up a rough riser.
Thank you very much.