A customer drilled a well about 800' from the nearest power source so we have been asked to do the job of getting a line out there.
It's though a level field and I could make it so there are no bends besides the general shape of the overall length which will be a giant crescent. So not perfectly straight but a very gradual arc.
The well guy hasn't done his final calc for wire size but says likely 2-2-4 AL+ground will be right. So I figure I'll lay 2" PVC to give myself some room.
I have read a lot of the past threads on longs pulls and it sounds like I can do this in one shot? I originally thought I'd use a couple ground boxes for pull points but if I can do it without a splice or box that seems the best. I would pull both ends of the conduit out of the trench for the pull and go straight in. I can likely borrow a tugger.
Does this sound like it will work? It's the longest pull I will have done but reading here I see people have done much longer without issue.
thanks for your ideas
It's though a level field and I could make it so there are no bends besides the general shape of the overall length which will be a giant crescent. So not perfectly straight but a very gradual arc.
The well guy hasn't done his final calc for wire size but says likely 2-2-4 AL+ground will be right. So I figure I'll lay 2" PVC to give myself some room.
I have read a lot of the past threads on longs pulls and it sounds like I can do this in one shot? I originally thought I'd use a couple ground boxes for pull points but if I can do it without a splice or box that seems the best. I would pull both ends of the conduit out of the trench for the pull and go straight in. I can likely borrow a tugger.
Does this sound like it will work? It's the longest pull I will have done but reading here I see people have done much longer without issue.
thanks for your ideas