Looking for a small 200 M/L BR panel

Status
Not open for further replies.
Since the original panel is still there, and now with no water-heater circuit, any loads that require a neutral can and should be supplied there.

I have actually challenged (civilly) an inspector's failure twice in the past, and was proven correct both times. I'm sure I'm right before I act.
Inspectors are human and can and do make mistakes. I lose respect when they say they are right yet won't produce code to back them up.
 