I want to direct bury 2-5 wire -4/0 cables w/7AWG ground in a 3 ft trench. The voltage is 208/120 3P. The circuits are 400amps/line. I want to separate the cables in the trench by at least 8". I can find derating for the HV 2000 and above for direct bury, but nothing directly, if any, is focused on LV. Is there a spec for this type of installation? We Power Engineers differ in our own office on whether it is necessary or we should just use the HV ratings.