Is it allowed by the NEC to install a 500kcm conductor to a 2-hole 4/0 lug. We have a breaker with a dual feed 4/0 lug and we are feeding it with a 500kcm. The engineer has OK'd the untwisting of 1/2 the strands to make the second termination on the dual lug. I think it will overheat and trip the breaker. What does the code say about this?