There is no reason you can't use a distribution panel to supply welding receptacles, presuming of course that the equipment ratings are appropriate for the intended load.  Welders are not motors, so I can't imagine supplying them from a motor control center.  And you certainly don't need to use switchgear construction for this type of load.  Are you being told otherwise?  If so, by whom, and in what context?