I gonna upgrade one of the service from 60A to 150A, but my inspector want me to do the load calculation. Currently the main service is 1200A 600V, If i just simply add all the disc rates together, the amp is about 1900A which means I need to add 90A to it. there is no main meter in this building and I am not sure is there a CT. the inspector tell me to get all tenants hydro bills for last 12 months, so i can get the peak hours power drives.(but this looks impossible for me to get all this info from all the tenant)
Is there any better way to get the load calculation
BTW I AM IN CANADA
Sent from my LYA-L0C using Tapatalk
Is there any better way to get the load calculation
BTW I AM IN CANADA
Sent from my LYA-L0C using Tapatalk