rookie4now
Senior Member
I was just wondering something. I saw a service yesterday that had a four-gang meter socket (horrizontal) and there were four panels below, one for each unit. Nothing special. then I noticed that it was fed with #1 awg copper. Again no big deal. The thing I'm wondering is that ALL 4 panels had a 125a breaker. That's a total of 500 amps. I realize that each individual unit is breakered at the appropriate amperage, but it seems pretty realistic to think that each unit might draw 50 amps at the same time and then there would be 200a flowing on #1 awg.
How does the NEC address this? There must be some maximun...right?