Crod2231985
Member
- Location
- Connecticut
Hello everyone new to posting but have been reading for awhile. Just so you know my background I've mainly done residential and decided change jobs to one that does more commercial and industrial after I got my lisence to try and become a better all around electrcian.
My new company is wiring a resturant and starting in the storage area with exposed ceilings and sheetrocked walls. I plan to pipe to the HR to a junction box in the ceiling close to top of framing, and come out with MC whip in to framing and loop out. Is there any problem with this.
Thanks in advanced
Chris
My new company is wiring a resturant and starting in the storage area with exposed ceilings and sheetrocked walls. I plan to pipe to the HR to a junction box in the ceiling close to top of framing, and come out with MC whip in to framing and loop out. Is there any problem with this.
Thanks in advanced
Chris