- Location
- Chapel Hill, NC
- Occupation
- Retired Electrical Contractor
Dick I don't think that is what I was asking. You are talking about a sleeve and I am talking about a complete raceway from panel to junction with mc inside.Here's what I did,the MC was routed inside of the sleeve and slack looped at the bottom to a fixed conduit fitting where the MC cable was terminated and entered the fitting,MC,all jackets etc were stripped back and conductors carried on in a closed conduit system to user.
dick