kwired
Electron manager
- Location
- NE Nebraska
- Occupation
- EC
On this single story building the cost difference does become closer, but you likely still can install underground faster. A big box store means running 20-30 feet up, following framing, more bending and fitting, and more trips up and down the scaffold or lift. Under the floor, unless you have rock hard base to dig through, can be run as the crow flies for the most part is quick and simple to cement raceways together Vs having to tighten fittings with wrenches or screwdrivers and the length of runs will be significantly shorter than for a building with high ceilings. One of the biggest challenges is going to be ensuring that you do emerge from the floor in the correct spot.