If normal MC cable has been installed from the local distribution panel through corridor ceilings, can I install a splice box in the hallway just outside each exam room and run approved "AC" cable (that has the bond wire in contact with the armor in addition to the separate insulated grounding conductor) from this splice box into the receptacles in the "Patient Care Areas". NOTE: There are no "emergency circuits" and these areas are not critical care type areas - just normal exam rooms in an outpatient facility. Can anyone help here???