This particular application is a service increase from 200 amps to 320 amps. The existing service is 200 amps with an exterior 200 amp MLO panel that feeds one interior panel, A/C and water heater loads. It has four 2-pole circuit breakers in the panel. I am adding another 200 amp MLO with the 320 meter can. The new or second panel will feed a garage with a 60 amp circuit and pool pump panel also fed from a 60 amp breaker. This will total six main disconnect switches. The poco engineer has per approved the installation, when its time to energize he decides that the meter can not feed two panels