Need to get an idea of the price difference between a four pack of meters with CT metering vs the cost of a twin pack percentage-wise. Slap me, I don't have any of my books for costing here in Alaska. It's a small commercial complex that could be made into smaller shops in the future. I doubt that it will ever be needed to have a four pack, but it's about satisfying the customer, so I need to gain costs in comparison for the client.
I basically have Cutler Hammer, Siemens, and Square D to select from for material packages.Am all ears, and thanks in advance for the help.