I'm looking at a job that currently has a bank of horizontal meter sockets that are ganged together.
The only knockout location in any of them is on the bottom. No top openings.The original install was designed for all feeds to leave the sockets and run underground to their perspective load centers throughout the strip mall.
Is it allowable to punch the top of the socket and use a sealing washer on the compression connector?
Iam looking at feeding two new tenants in the mall.
There are 6 sockets , 4 in use and the two spares are in the middle of the group and coming off the bottom isn't an option.
Thanks
Both new feeds can be surface mounted to the building exterior .
The only knockout location in any of them is on the bottom. No top openings.The original install was designed for all feeds to leave the sockets and run underground to their perspective load centers throughout the strip mall.
Is it allowable to punch the top of the socket and use a sealing washer on the compression connector?
Iam looking at feeding two new tenants in the mall.
There are 6 sockets , 4 in use and the two spares are in the middle of the group and coming off the bottom isn't an option.
Thanks
Both new feeds can be surface mounted to the building exterior .