P pridelion Member Feb 19, 2007 #1 I am going to be installing a meter stack module with 5 meter sockets with main breakers. 400amp bus, 125 main amp breakers. Will I need a main disconnect ahead of the meter stack module ?
I am going to be installing a meter stack module with 5 meter sockets with main breakers. 400amp bus, 125 main amp breakers. Will I need a main disconnect ahead of the meter stack module ?