Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
Anyone familiar with running this? As you see I have a lot. I know you need to transition over to wire type conductors when landing at equipment to terminate. I thought only way to really do that is mount a box and splice as shown below in link for single conductor MI. The multi conductor MI shows terminating directly at equipment enclosure.
