ATSman
ATSman
- Location
- San Francisco Bay Area
- Occupation
- Electrical Engineer/ Electrical Testing & Controls
Hard to tell from this photo angle, but are those yellow bollards far enough out in front of the gear to meet the clearance requirements?
Saw this in the back room of a grocery store. I know it all comes down to the money in the shortage
of electrical inspections.
Comments?
Good Question. I will check next time.
Accessible, Readily (Readily Accessible). Capable of being reached quickly for operation, renewal, or inspections without requiring those to whom ready access is requisite to actions such as to use tools, to climb over or remove obstacles, or to resort to portable ladders, and so forth.
Good Question. I will check next time.
After measuring, the bollards are 22.5 inches from the front of the panel. How did this ever pass inspection unless they were installed after inspection.