- Location
- Wisconsin
- Occupation
- PE (Retired) - Power Systems
Also don't forget to make the measurements during a brownout voltage condition.Unless you are controlling the outdoor temperature and the supply voltage during your testing, no matter how hard you try you are not forcing the worst case operating conditions that the MCA has to account for.