I am looking into drawing up electrical plans for a cabin structure at a state park. The cabin will be built and wired, then moved on to the site. The bid specs tell us to submit a wiring plan to be approved by an engineer. These plans must meet the national mobile home builders association criteria. Does the NEC (NFPA 70) cover this or is there a special codebook that I need to be looking at? Thank you for your knowledge.