Greetings all customer has a ATS for a 14kw generator on a 200A single phase service, but as things change they no longer need the 'automatic' part and are adding loads. I was asked to disable the automatic transfer function of an ATS and just make a manual transfer circuit, like and 'transfer' trigger switch next to the ATS?
I know you can get all fancy with a load management system or split the loads out of the panel to a critical loads panel.
I am just wondering if anyone has done this?
Thanks
I know you can get all fancy with a load management system or split the loads out of the panel to a critical loads panel.
I am just wondering if anyone has done this?
Thanks