Had a 400 amp meter base supplying 2-200 amp disconnects behind meter base inside a residence. A generator was installed with a service rated transfer switch/disconnect outside. One of the inside panels now becomes a sub panel with isolated neutrals and an added egc. I now have one service panel inside and one outside. Is this permissible?